• RSS
  • Twitter
  • FaceBook

Related Topics

Add White Papers

Get your company's white papers in the hands of targeted business professionals.

schneider electric

Results 1 - 25 of 219Sort Results By: Published Date | Title | Company Name
By: Anaplan     Published Date: Sep 07, 2018
Le principal avantage des projets bien pense?s et bien conduits, c’est qu’ils aboutissent immanquablement au me?me re?sultat. Un cahier des charges est e?tabli, un appel d’offres est lance?, un plan projet est agre?e?, une solution est trouve?e, la mise en oeuvre se fait dans les conditions pre?vues… et le premier constat des utilisateurs est que le re?sultat final ne correspond plus aux besoins du moment. Dans un monde dont le rythme de transformation s’acce?le?re, les enjeux d’une bonne planification et mode?lisation se de?placent. Si la qualite? des mode?les et des simulations demeure importante, la capacite? a? modifier des plans, revoir des organisations, simuler des hypothe?ses impre?vues, le tout en quelques minutes, devient une impe?rieuse ne?cessite?. Un nombre croissant d’entreprises fait confiance a? Anaplan pour relever ce de?fi. Découvrez à travers cet Ebook les 5 témoignages de UFF, AXA, AccorHotels, Schneider Electric et Onduline.
Tags : 
    
Anaplan
By: Anaplan     Published Date: Sep 19, 2018
Le principal avantage des projets bien pense?s et bien conduits, c’est qu’ils aboutissent immanquablement au me?me re?sultat. Un cahier des charges est e?tabli, un appel d’offres est lance?, un plan projet est agre?e?, une solution est trouve?e, la mise en oeuvre se fait dans les conditions pre?vues… et le premier constat des utilisateurs est que le re?sultat final ne correspond plus aux besoins du moment. Dans un monde dont le rythme de transformation s’acce?le?re, les enjeux d’une bonne planification et mode?lisation se de?placent. Si la qualite? des mode?les et des simulations demeure importante, la capacite? a? modifier des plans, revoir des organisations, simuler des hypothe?ses impre?vues, le tout en quelques minutes, devient une impe?rieuse ne?cessite?. Un nombre croissant d’entreprises fait confiance a? Anaplan pour relever ce de?fi. Découvrez à travers cet Ebook les 5 témoignages de UFF, AXA, AccorHotels, Schneider Electric et Onduline.
Tags : 
    
Anaplan
By: APC by Schneider Electric     Published Date: Feb 09, 2011
In the broadening data center cost-saving and energy efficiency discussion, data center physical infrastructure preventive maintenance (PM) is sometimes neglected as an important tool for controlling TCO and downtime. PM is performed specifically to prevent faults from occurring. IT and facilities managers can improve systems uptime through a better understanding of PM best practices.
Tags : 
absolute, data protection, maitenance, ups, physical infrastructure, infrastructure, data loss protection, dlp
    
APC by Schneider Electric
By: APC by Schneider Electric     Published Date: Feb 15, 2011
This paper analyzes several of these incidents and makes recommendations for how a basic monitoring system can help reduce the occurrence of these unanticipated events.
Tags : 
apc by schneider electric, monitoring systems, human error, distributed server rooms, remote wiring closet, downtime, monitoring, remote network management
    
APC by Schneider Electric
By: APC by Schneider Electric     Published Date: Feb 15, 2011
This paper divides the realm of data center "Operations Technology" into four distinct domains and compares the primary and secondary functions of key subsystems within these domains.
Tags : 
apc by schneider electric, classification, data center operations technology, ot management tools, software management tool, physical infrastructure, infrastructure, server hardware
    
APC by Schneider Electric
By: APC by Schneider Electric     Published Date: Feb 15, 2011
This paper discusses the common errors and misunderstandings in evaluating UPS efficiency.
Tags : 
apc by schneider electric, ups system, energy resource, electrical efficiency, infrastructure, server hardware, servers, green computing
    
APC by Schneider Electric
By: APC by Schneider Electric     Published Date: Feb 15, 2011
This paper explains how to quantify the electricity savings and provides examples of methods that can greatly reduce electrical power consumption.
Tags : 
apc by schneider electric, electricity usage, energy efficient data centers, power consumption, network infrastructure, total cost of ownership, tco, infrastructure
    
APC by Schneider Electric
By: APC by Schneider Electric     Published Date: Feb 15, 2011
This paper describes the principles of a new, commercially available data center architecture that can be implemented today to dramatically improve the electrical efficiency of data centers.
Tags : 
apc by schneider electric, data center, power and cooling, infrastructure, electrical efficiency, data center architecture, network architecture, network management
    
APC by Schneider Electric
By: APC by Schneider Electric     Published Date: Feb 15, 2011
This paper explains some the newer approaches to power distribution including modular power distribution and overhead power busway, and shows their advantages when compared to the legacy approach.
Tags : 
apc by schneider electric, scalable, reconfigurable, data center, power distribution architecture, power density, power monitoring, power distribution
    
APC by Schneider Electric
By: APC by Schneider Electric     Published Date: Feb 15, 2011
This paper examines both methodologies and highlights the reasons why hot-aisle containment emerges as the preferred best practice.
Tags : 
apc by schneider electric, data center, hot-aisle containment, cooling system, green computing, power and cooling, data center design and management
    
APC by Schneider Electric
By: APC by Schneider Electric     Published Date: Jan 21, 2016
IT virtualization, the engine behind cloud computing, can have significant consequences on the data center physical infrastructure.
Tags : 
cbs interactive, cloud, virtualization, infrastructure, network architecture, servers, it spending, power and cooling
    
APC by Schneider Electric
By: APC by Schneider Electric     Published Date: Jan 21, 2016
It is no longer practical or cost-effective to completely engineer all aspects of a unique data center.
Tags : 
cbs interactive, data center, reference design, data security, servers, blade servers, power and cooling, data center design and management
    
APC by Schneider Electric
By: APC by Schneider Electric     Published Date: Jan 21, 2016
This paper proposes standard terminology for categorizing the types of prefabricated modular data centers, defines and compares their key attributes, and provides a framework for choosing the best approach(es) based on business requirements.
Tags : 
cbs interactive, data, security, cloud, infrastructure, internetworking hardware, server hardware, servers
    
APC by Schneider Electric
By: APC by Schneider Electric     Published Date: Jan 21, 2016
This paper discusses making realistic improvements to power, cooling, racks, physical security, monitoring, and lighting.
Tags : 
cbs interactive, server, data, cloud, security, migration, monitoring, network architecture
    
APC by Schneider Electric
By: Box     Published Date: Jun 11, 2014
Global energy management giant based in France rolled out Box to 67,000 employees, enabled BYOD, and boosted productivity. Use Box for RFPs, vendor collaboration, executives, sales presentations. Cut server costs by 30%. Energy industry, large company, EMEA, global, sales LOB, BYOD, server replacement.
Tags : 
box, schneider, electric, vendor collaboration, global sales, lob, byod, server replacement
    
Box
By: Entelo     Published Date: Sep 06, 2017
While there are many approaches to attracting diverse candidates, sourcing and pipeline management is one of the most critical. As organizations attempt to increase their sourcing efficiency by narrowing their focus on high-yield sources, they may inadvertently impact their ability to attract or find diverse candidates. Stacia Sherman Garr, VP and Talent Management Research Leader at Bersin by Deloitte, Deloitte Consulting LLP, will share five critical sourcing practices organizations can use to attempt to address this situation, expand their talent pools, and enhance their capability to identify diverse talent. We'll also share Schneider Electric's story of how they've used better sourcing and pipeline management to meaningfully impact their diversity hiring numbers. In this webinar, you'll learn: The role of diversity sourcing in creating an inclusive organization The importance of considering sourcing efficiency and its impact on diversity recruiting Five practices to help impr
Tags : 
    
Entelo
By: Modicon PLC     Published Date: Dec 04, 2012
Our repair technicians are capable of repairing most Modicon - Schneider Electric parts same day. Our exchange program allows us to send you a remanufactured unit while allowing you 30 days to return the failed unit for a credit.
Tags : 
    
Modicon PLC
By: Riverbed     Published Date: Feb 26, 2015
Riverbed Cloud Steelhead appliances support IT migration to cloud computing, SaaS and IaaS.
Tags : 
saas, cloud based, applications, it migration, iaas, cloud computing, data management
    
Riverbed
By: Schneider Electric     Published Date: Jun 04, 2014
Business executives are challenging their IT staffs to convert data centers from cost centers into producers of business value. Data centers can make a significant impact to the bottom line by enabling the business to respond more quickly to market demands. This paper demonstrates, through a series of examples, how data center infrastructure management software tools can simplify operational processes, cut costs, and speed up information delivery.
Tags : 
schneider, electric, data, infrastructure, convert data, business value, it management, data management
    
Schneider Electric
By: Schneider Electric     Published Date: Jun 04, 2014
While many who invest in Data Center Infrastructure Management (DCIM) software benefit greatly, some do not. Research has revealed a number of pitfalls that end users should avoid when evaluating and implementing DCIM solutions. Choosing an inappropriate solution, relying on inadequate processes, and a lack of commitment / ownership / knowledge can each undermine a chosen toolset’s ability to deliver the value it was designed to provide. This paper describes these common pitfalls and provides practical guidance on how to avoid them.
Tags : 
schneider, electric, dcim, solution, invest, infrastructure, management, software
    
Schneider Electric
By: Schneider Electric     Published Date: Jun 04, 2014
When faced with the decision of upgrading an existing data center, building new, or leasing space in a retail colocation data center, there are both quantitative and qualitative differences to consider. The 10-year TCO may favor upgrading or building over outsourcing, however, this paper demonstrates that the economics may be overwhelmed by a business’ sensitivity to cash flow, cash cross-over point, deployment timeframe, data center life expectancy, regulatory requirements, and other strategic factors. This paper discusses how to assess these key factors to help make a sound decision.
Tags : 
schneider, electric, data, infrastructure, upgrade, retail, outsource, own
    
Schneider Electric
By: Schneider Electric     Published Date: Jun 04, 2014
70% of data center outages are directly attributable to human error according to the Uptime Institute’s analysis of their “abnormal incident” reporting (AIR) database1. This figure highlights the critical importance of having an effective operations and maintenance (O&M) program. This paper describes unique management principles and provides a comprehensive, high-level overview of the necessary program elements for operating a mission critical facility efficiently and reliably throughout its life cycle. Practical management tips and advice are also given.
Tags : 
schneider, electric, data, center, facility, operations, maintenance, management
    
Schneider Electric
By: Schneider Electric     Published Date: Jun 04, 2014
Standardized, scalable, pre-assembled, and integrated data center facility power and cooling modules provide a “total cost of ownership” (TCO) savings of 30% compared to traditional, built-out data center power and cooling infrastructure. Avoiding overbuilt capacity and scaling the design over time contributes to a significant percentage of the overall savings. This white paper provides a quantitative TCO analysis of the two architectures, and illustrates the key drivers of both the capex and opex savings of the improved architecture.
Tags : 
schneider, electric, data, center, scalable, integrated, power, cooling
    
Schneider Electric
By: Schneider Electric     Published Date: May 04, 2016
This paper discusses advanced technologies and tools that enable greater pipeline integrity, particularly computational pipeline monitoring (CPM) methodologies as a means to identify anomalies that signal a possible commodity pipeline release.
Tags : 
pipeline integrity, oil and gas, pipelines, control room, control room management, leak detection, schneider electric, telvent
    
Schneider Electric
By: Schneider Electric     Published Date: May 04, 2016
This paper discusses how an automated system helps pipeline operators comply with new federal regulations by safely reducing demands placed on controllers and the fatigue often associated with their tasks.
Tags : 
pipeline integrity, oil and gas, pipelines, control room, control room management, leak detection, schneider electric, telvent
    
Schneider Electric
Start   Previous   1 2 3 4 5 6 7 8 9    Next    End
Search White Papers      

Community Area

Log in | Register

Solution Center

Follow TechGenix on Twitter